Finally the workers have come to make over our back yard. They took out the small patio and prepared the new patios and steps.
They dug up the boxwoods and placed them to the side for later. They saved the sod that was taken up for the new patios. Hope that can be used, too.
Concrete was poured Wednesday. It rained Tuesday evening but not enough to cause problems.
Steps and footings for retaining walls was poured.
The lower patio will be laid on crushed stone, not concrete.
Jane the cat inspected everything.
She looked over the footings.
All good!
Flagstone upper patio in progress.
Looking forward to good times outside soon.
No comments:
Post a Comment